Colossale Siteworks is undertaking a major drainage infrastructure upgrade to reduce local flooding by upsizing existing drainage pipes and installing 54” RCP with two large concrete junction chambers. The project also includes full reconstruction of curbs, sidewalks, and roadways to restore the affected area.
Work is being carefully coordinated within an active city street, requiring deep trench excavation and strategic traffic management to minimize disruptions to homeowners. Safety remains a top priority, with barriers, barricades, and fencing in place to protect both the public and construction crews. The project is scheduled for completion in August 2025.