by Colossale Siteworks | Aug 17, 2026 | Uncategorized
Colossale Siteworks is currently at work in New Britain, Connecticut, supporting the City’s West Main Street Complete Streets Improvements from Vine Street to Lincoln Street. The project is designed to create a safer, more accessible corridor for pedestrians,...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
This video documents Colossale Siteworks’ work at Pleasant Valley Elementary School — a project focused on strengthening site infrastructure while maintaining a safe and uninterrupted school environment. From underground utility upgrades to surface restoration, the...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
This project has us leading a major drainage infrastructure upgrade along McKinley Drive to address persistent local flooding and improve long-term stormwater capacity within the neighborhood. The project includes upsizing existing drainage systems and installing new...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
Burlington Road Reconstruction Sitework | Excavation | Material Removal | Utility & Drainage | Curbs & Sidewalks Location: Farmington, CT The reconstruction of Burlington Road for the Town of Farmington revitalizes a critical corridor that connects State Route 177...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
We are proud to be part of the ongoing upgrades to the historic Rocky Hill–Glastonbury Ferry landings, working in partnership with the Connecticut Department of Transportation to enhance one of the state’s most iconic river crossings. The project focuses on improving...