by Colossale Siteworks | Feb 23, 2026 | Uncategorized
This video documents Colossale Siteworks’ work at Pleasant Valley Elementary School — a project focused on strengthening site infrastructure while maintaining a safe and uninterrupted school environment. From underground utility upgrades to surface restoration, the...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
This project has us leading a major drainage infrastructure upgrade along McKinley Drive to address persistent local flooding and improve long-term stormwater capacity within the neighborhood. The project includes upsizing existing drainage systems and installing new...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
For Mile Creek Elementary School in Old Lyme, we are working on site infrastructure improvements that will allow the campus to meet current codes while preparing it for long-term performance. The project includes installation of a new fire service line, upgraded...
by Colossale Siteworks | Feb 23, 2026 | Uncategorized
We are proud to be part of the ongoing upgrades to the historic Rocky Hill–Glastonbury Ferry landings, working in partnership with the Connecticut Department of Transportation to enhance one of the state’s most iconic river crossings. The project focuses on improving...
by Colossale Siteworks | Feb 21, 2025 | Uncategorized
Colossale Siteworks is undertaking a major drainage infrastructure upgrade to reduce local flooding by upsizing existing drainage pipes and installing 54” RCP with two large concrete junction chambers. The project also includes full reconstruction of curbs, sidewalks,...
by Colossale Siteworks | Jan 17, 2025 | Uncategorized
Colossale Siteworks is proud to support the Prudence Crandall Center, a vital organization dedicated to providing safety, healing, and hope for survivors of domestic abuse. Colossale Siteworks is helping the Center continue its mission of offering critical services to...