by Colossale_Staff | Mar 12, 2024 | Uncategorized
This project has kept us on our toes – renovating a 120-year-old factory has presented many obstacles to underground construction and has required numerous design changes to complete systems. We have been responsive to the changes in design plans and have...
by Colossale_Staff | Dec 19, 2023 | Uncategorized
We’ve recently begun work on this site – our work includes: Setting up logistics with erosion controls, temp fencing, staging area, field office utilities and storage area. Installing several hundred protective matts throughout the facility secure zones...
by Colossale_Staff | Dec 19, 2023 | Uncategorized
We are proud to be part of this historical building renovation project taking place in New Britain. The final layout will house 154 apartments, personal storage and common areas for residents. For us, the most challenging items consist of 600 feet of underslab...
by Colossale_Staff | Dec 19, 2023 | Uncategorized
For this project we are demolishing the existing concrete ramp and staircase. In its place, we are pouring a concrete core wall with an incorporated planter that will be clad with precast and recessed lighting. The new ramp will be poured over an existing reinforced...
by Colossale Siteworks | Oct 12, 2023 | Uncategorized
Located in Berlin but owned by the City of New Britain, this landfill has been capped for several decades. In recent years the City was able to obtain a permit from CT DEEP to add 3′ to 6′ of fill atop the existing cap. We were able to utilize...
by Colossale Siteworks | Oct 12, 2023 | Uncategorized
Stanley Quarter Park Pond is nearing completion after a year-long dredging project that included approximately 19,000 cubic yards of material hauled to a landfill site in Berlin, CT. This material posed a challenge in loading and hauling due to the geological makeup...